Back to Home Page>> Frequently Asked Questions Regarding Completion Certificate Q: What is CC ? A: CC is a Completion Certificate of the building issued to occupy the building. Q: Is the CC Mandatory (Compulsory) ? A: Yes. As per the KMC Act 310, CC is mandatory for each and every building. Q: Why CC is Necessary ? A:
Therefore it is obligatory to obtain completion certificate as per section 301 of K.M.C. Act 1976. Q: How can I obtain my house CC ? A: You can obtain your house CC by enclosing your permission drawing with up to date tax paid receipt, water tax etc, with proper CC Application to the respective Chief Officer as per the CMC procedure. Q: What are the documents necessary to obtain the CC ? A: 1. Xerox copy of the approved building plan & permission letter 2. Building plan drawn to a scale 1:100 showing all existing details as built(2 blue prints with tracing) 3. Up to date property tax paid receipt(Xerox) 4. Up to date water tax paid receipt(Xerox) 5. U.G.D connection fee paid receipt(Xerox) 6. Electricity cable & road cutting charges paid receipt (Xerox) 7. Bore well permission fees paid receipt 8. Affidavit/Declaration enclosed ( In case of Commercial building Affidavit and for residential building only declaration) Note : In case of Sl.Nos. 3 to 7 if any receipt is not obtained, the same shall be obtained from the concerned Office by paying the necessary charges. Q: What are the different types of forms used for CC ?
Q: If I don?t obtain my CC , what will be the result ? A: CMC will warn you with notice to obtain the CC. Q: If I ignore the CMC Notice then what will be the result ? A: CMC will take rapid action on your illegal asset & take legal action on you as per the KMC act. Q: Can I celebrate ?Grahapravesha? without obtaining the CC ? A: No. It is illegal if you have the done the Grahapravesha without CC. Rs.500 will be levied as a penalty in addition to the normal CC fee. Q: Can I hire a portion in a building for which the Building doesn?t have CC ? A: No. It is illegal occupation of the building part. Again CMC will take rapid action. Q: Can I obtain my house CC without consulting engineers ? A: No. It is necessary to give your consulting engineer schedule VIII duly filled & signed. Q:What is the role of consulting engineer in obtaining CC ? A: Consulting civil engineer should sign CC form, C1, C2 & C3 with board ?A? & board ?B? and should sign for the same Q: What will happen if the building is constructed with more than 5% violation/deviation of the approved plan? A: Excess portion will be demolished by enforcement wing Q: Can I regularize more than 5% of the excess construction of the building ? A: No. It is not possible to regularize more than 5% of the permitted construction of the building in any case.
|
|
This Page is Managed by :Assistant Executive Engineer,Chitradurga CMC. Website Designed and Maintained by : K.Suresh,Senior Programmer ,Chitradurga CMC Mobile:9880170557 |